State-of-the-art warehouse in Mirande de Ebro
Plot of 284,779.55m2 Total GLA 133,087m2 This is the largest logistics project in Spain divided into two warehouses by 2024.
NAVE A
Total m2 63.953m2
NAVE B
Total m2 70.905m2
- Ships can be divided into up to four modules
- Each ship has a clear height of 11m
-Overload screed 8T punctual 6TNm2 load distributed
-ESFR K25 Sprinklers (According to NFPA standard)
-Fire load for medium risk activities level 5
-Solar panels (100KW per house)
-BREEAM Very Good Certified
- Electrical power 35W/m2
-LED/BMS lighting and 4% daylight
-156 Loading docks (Hall A:72 / Ship B:84)
• Manoeuvring beaches: 35m
-1,295 Car Spaces (3% with electric charger)